Bolsover Street, London W1

Supply and erect approx 90 tonne of structural steelwork to create a new framework around and above an existing grade 2 listed hall. An additional two floors were then built which formed the new penthouses

The five main trusses were lifted into position over the existing hall using a tower crane. Each fully welded truss weighed in at over 6 tonne