Gee Street, London EC1

Supply and install brise soleil frames, various internal stair structures (complete with balustrades), roof cowls and 22 tonne of structural steelwork at roof level to create an additional floor

This new development was in an extremely tight, challenging site in the heart of London. Steels were erected using a tower crane